3 - 24
E - EVERY 1000 HOURS OF OPERATION
Perform the operations described previously as well as the following operations.
E1/1
E1 - C
OOLING LIQUID
EMPTY - REPLACE
This series of operations is performed as required and once a year as winter
approaches.
Set the platform on a horizontal surface with the engine stopped and cold.
DRAINING THE COOLANT
- Open the left-hand cover.
- Loosen the radiator purge screw 1 (Fig. E1/1).
- Loosen the drain plug 2 (Fig. E1/2) on the engine block.
- Remove the radiator filling cap 3 (Fig. E1/3).
- Let the cooling circuit drain completely, ensuring that the holes are not
obstructed.
- Check the condition of the hoses and the fixings and replace the hoses if
necessary.
- Rinse out the circuit with clean water and use a cleaning product if
necessary.
FILLING WITH COOLANT
- Retighten the purge screw 1 (Fig. E1/1).
- Retighten the drain plug 2 (Fig. E1/2) (tightening torque 0.8 to 1.2 daN.m).
- Prepare the coolant (Fig. E1/4).
- Slowly fill the cooling circuit completely via the filing hole 4 (Fig. E1/3).
- Let the engine tick over for a few minutes.
- Check for any leaks.
- Check the level and fine tune it if necessary.
- Refit the filling cap 3 (Fig. E1/3).
The IC engine contains no anti-corrosion elements and must be filled every
year with a minimum mixture of 25% ethylene glycol-based anti-freeze.
E1/2
E1/3
3
2
4
1
-16° C
-18° C
-25° C
-37° C
TEMPERATURE
E1/4
FREEZING POINT IN FUNCTION
OF THE ANTI-FREEZE %
ANTI-FREEZE
5110 NF
30 %
33 %
40 %
50 %
Summary of Contents for 160 ATJ
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 1 1 OPERATING AND SAFETY INSTRUCTIONS 1 OPERATING AND SAFETY INSTRUCTIONS...
Page 8: ......
Page 25: ...1 19 REAR AXLE ASSEMBLY FIG E Axle type Serial Nr Maker s N E...
Page 28: ...1 22...
Page 29: ...2 1 2 DESCRIPTION 2 DESCRIPTION...
Page 30: ......
Page 31: ...2 3...
Page 37: ...2 9...
Page 39: ...2 11...
Page 41: ......
Page 74: ...2 46 MAIN DISTRIBUTOR Basket rotation Turret rotation Steering Pendular arm Tilt compensation...
Page 75: ...3 MAINTENANCE 3 MAINTENANCE...
Page 76: ......
Page 78: ......
Page 105: ...3 31...
Page 107: ...3 33 G3 2 Centre of gravity Platform s total weight 8090 Kg...
Page 111: ...4 ELECTRICITY 4 ELECTRICITY 4 1...
Page 112: ...4 2...
Page 114: ...4 4...
Page 115: ...5 1 5 OPTIONAL ACCESSORIES FOR THE RANGE 5 OPTIONAL ACCESSORIES FOR THE RANGE...
Page 116: ...5 2...
Page 120: ...5 6...
Page 121: ...6 1 6 MAINTENANCE HANDBOOK 6 MAINTENANCE HANDBOOK...
Page 122: ......
Page 130: ......
Page 131: ...Powered by TCPDF www tcpdf org...