32
A-A
X
≥
1
0
0
= min. 30 mm, max. 400 mm
Position:
1
SEDM-L
2
Solid wall construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT B 1S 140/50 - min.
density 140 kg/m
3
+ Firestop acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT, PROMASTOP-CC or
equivalent)
5
Overplating strip (e.g. Supalux-S, th. 15 mm)**
6
Screw UNI 4x40 mm (span 200 to 250 mm)
7
Spacing strip (e.g. Supalux-S, th. 12 mm, width 40 to 50 mm)
8
M8 bolt assemply (bolt M8x105 mm, 2 pcs large washer M8, nut M8)*
9
M8 bolt assemply (bolt M8x105 mm, 2 pcs large washer M8, nut M8), span 200-300 mm
X
A
y
y
y
B
B
A
y
≥ 1
00
Y
≥ 100
B-B
Y
In case of installation damper tightly above
the floor, must be joint between damper
body and floor max. 75 mm and must be
completely filled with gypsum.
Each damper must be suitably supported in
each corner, front and rear with temporary
supports, whilst being Installed and fire
stopped, final supporters must be installed
back to studs work or steel work as required.
Bolts and nuts shall not prevent free rotation
on the blades.
Examples of anchors to the fire dividing
construction see. chapter 6.5. and 6.6.
When installing a flange, overplating
strip is not installed.
Summary of Contents for SEDM-L
Page 1: ......
Page 12: ...12 Dimensions...
Page 13: ...13 A A 30 A B 17 10 10 X A A Detail X Detail Y B B B B Y...
Page 14: ...14...
Page 19: ...19...
Page 20: ...20 X Detail X Position 1 SEDM L 2 Flange Detail X Detail Y Detail Y Y...
Page 24: ...24...