31
A-A
X
≥
1
0
0
Y
B-B
≥ 100
B
B
A
A
≥ 1
00
Y
Examples of anchors to the fire dividing
construction see. chapter 6.5. and 6.6.
In case of installation damp-
er tightly above the floor,
must be joint between damp-
er body and floor max. 75
mm and must be completely
filled with gypsum.
Each Damper must be suita-
bly supported in each corner
front and rear with temporary
block-work, temporary steel
supports or similar, until gyp-
sum has fully hardened.
Position:
1
SEDM-L
2
Solid wall construction
3
British gypsum thistle bond 60
(or equivalent can
by used) minimum density 670 kg/m³)
4
Overplating strip (e.g. Supalux-S, th. 15 mm)**
5
Screw UNI 4x40 mm (span 200 to 250 mm)
6
Spacing strip (e.g. Supalux-S, th. 12 mm, width 40 to 50 mm)
7
M8 bolt assemply (bolt M8x105 mm, 2 pcs large washer M8, nut M8)*
8
M8 bolt assemply (bolt M8x105 mm, 2 pcs large washer M8, nut M8), span 200 to 300 mm
X
Bolts and nuts shall not prevent
free rotation on the blades.
When installing a flange, over-
plating strip is not installed.
Summary of Contents for SEDM-L
Page 1: ......
Page 12: ...12 Dimensions...
Page 13: ...13 A A 30 A B 17 10 10 X A A Detail X Detail Y B B B B Y...
Page 14: ...14...
Page 19: ...19...
Page 20: ...20 X Detail X Position 1 SEDM L 2 Flange Detail X Detail Y Detail Y Y...
Page 24: ...24...