Page 25
Version 2023-06-07
Smoke extraction damper - SEDM-D
TPM 155/22
Installation - shaft from concrete or aerated concrete
With mastic, mortar or gypsum
B + 10
H
+
1
0
≥ 70
Installation opening
1 Concrete or aerated concrete
2 Fire-resistant mastic (E.g. HILTI Firestop Acrylic coating SFS-S ACR),
mortar or gypsum
3 SEDM-D
4 Screw 6x100 mm 4x (connection of the damper with shaft)
A
Detail A
Detail of connection of the damper with shaft
5
≥ 70