21
TPM 092/13
Fig. 37
Installation frame D6
Solid wall construction
Position:
1
Fire damper with installation frame D6
2
Insulation made of kalciumsilkat boards min. density
450 kg/m . Thickness 40 mm
3
Casing framesmade of kalciumsilkat boards min. density
450 kg/m . Thickness 40 mm
Notice: All items are glued by PROMAT K84 and secured by screws. Suspension of fire dampers has to be ensured
accordingly chapter 7
Installation opening:
d = (D + 100 mm)
+3
3
1
2
80
40
≤ 300
≤ 300
≤ 300
Screw
(min. 4x80)
≤ 300
≤ 300
≤ 300
Screw
(min. 4x80)
2
3
40
80
1
≤ 300
≤ 300
Screw
(min. 4x80)
≤ 300
Screw
(min. 4x80)
≤ 300
≤ 300
≤ 300
Screw
(min. 4x80)
Solid ceiling construction
Screws has to be firmly fixed in wall/ceiling
construction. (If it is necessary use steel
anchors).
3
3
EIS 90