Commissioning and operation
19
Connecting the control unit
Two cable harnesses are supplied with
the engine:
D
The cable harness for the input signals
to the control unit
D
The cable harness for the output sig-
nals from the control unit
The plugs (14-pin and 10-pin) are de-
signed to prevent them from being in-
serted in the wrong socket.
The cable harness for the output signals
from the control unit is already connected
to the engine.
Summary of Contents for E 0824 E 301
Page 1: ......
Page 2: ......
Page 14: ...Commissioning and operation 12 Engine views E 0824 E 301 302 1 2 3 4 5 6 7 8 9 10 11 12...
Page 16: ...Commissioning and operation 14 Engine views E 0826 E 301 302 1 2 3 4 5 6 7 8 9 10 11 12...
Page 35: ...Notes 33...
Page 41: ...39 Circuit diagrams...
Page 45: ...Notes 43...
Page 47: ......
Page 48: ......