System Overview
Chapter 4
Zetasizer Nano Basic Guide
Page 4-21
ill 7945
c.
Holding the cell near its top, turn the weld towards the front of the instrument.
It
must
face the front of the Nano when inserted.
d.
Push the cell into the cell holder until it stops.
ill 7946
e.
Close the measurement chamber lid to cover the cell.
The test runs - pass or fail?
Each test should take no longer than about six minutes.
a.
After a two minute thermal equilibration period, the window will show the test
running, like this:
Zetaszier Nano Basic Guide (Man0486-1.0).book Page 21 Monday, September 10, 2012 2:19 PM