
Mai ntenance
56
Step
Action
ing nut where the paddle stem meets the pipette with your other hand.
3
Let the retaining nut drop into the Clean Location.
Move the pipette to the Load Location
To move the pipette to the Load Location, follow the instruction video and/or the soft-
ware guided workflow integrated in the MicroCal PEAQ-ITC Control Software.
The software guided workflow is also shown in the following table.
Step
Action
1
Make sure that the Load Location does not contain a microcentrifuge tube.
2
Move the pipette to the Load Location.
Note
: It should not be necessary, but have your hand ready to receive the syringe glass.
3
Click
Next
.
Result
: The instrument will move the plunger down and press out the syringe glass.
Remove the syringe glass and the plunger tip
To remove syringe glass and plunger tip, follow the instruction video and/or the software
guided workflow integrated in the MicroCal PEAQ-ITC Control Software.
The software guided workflow is also shown in the following table.