4. COMMISSIONING
4.1 FILLING WATER TO THE SYSTEM
&
CAUTION!
Before making the primary circuit connections to the boiler, make sure that the primary circuit
is clean. The primary circuit must be flushed and and particules inside the installation must
be cleaned so that these particules do not damage the boiler during operation. This is
especially important when using an old existing primary circuit installation. Any failures and
damages to the boiler cuased by dirty primary circuit installiation is out of manufacturer’s
warranty.
24
a) Make sure that the automatic air vent on the circulation pump is loose.
b) Turn on the filling valve and fill water until the pressure reaches 1.5 bars by checking the
manometer. Close the filling valve.
c) Use the manual air vent on top of the boiler to extract the air trapped inside the heat
exchanger. Close the manual air vent when bubble free water comes out of the drain hose.
d) Vent the air inside each radiator until bubble free water comes out, using the air vents on
the radiators.
e) Check the water pressure on the manometer. If it decreased, turn on the filling valve to
reach 1.5bars.
f) Repeat steps c,d and e until there is no air left in the system and the manometer showing
1.5 bars.
Manual air vent
Summary of Contents for OMEGA
Page 1: ...rev no 02 23 08 2019...
Page 16: ...13...
Page 31: ...28 5 3 TROUBLESHOOTING...
Page 34: ...31 7 TECHNICAL TABLE...
Page 39: ...10 3 RELAY BOARD GROUP DETAIL 36 66 67 68 69 70 71 72...
Page 42: ...11 1 MAIN HEAT EXCHANGER GROUP DETAIL 39 31 32 34 33 35 36 37 42 43 44 46 38 39 40 41 45...
Page 43: ...11 2 RELAY BOARD GROUP DETAIL 40 47 48 49 50 51 52 53 54...