SECTIONS OF THE BOILER
1. Control Panel
2. Top (cleaning) cover
3. Bottom (ignition) cover
4. Fan
5. Burning Tank
6. Sieve
7. Bunker
8. Engine with Reductor
9. Shaft with Reductor and Helezon
10. Boiler Water In
11. Safety Water In
12. Chimney
13. Smoke Case
14. Boiler Water Out
15. Safety Water Out
16. Filling and Draining
4. INSTALLATION
Boiler must be installed evenly and must be placed on 10 cm high place in boiler room
installations.
Boiler must be connected to a good drawing chimney and minimum quantity elbows
should be used between chimney and boiler.
Boiler must be placed where has enough air for an efificient burning. It is required to use
open expansion tank in installation MAKTEK MKK-S series boilers.
Boiler- expansion tank return pipes must be absolutely isolated in extreme cold regions.
Warning line should be installed for taking the overflow water from the expansion tank.
There shouldn't be any valves, nonreturn valves on the pipes between boiler expansion
tank
Expansion tank volumes based on capacity are shown below:
7