Maktek 25 MKB-S Installation Use And Maintainence Manual Download Page 20

12. CARRYING AND TRANSPORT

A) PLACING THE BOILER ON VEHICLE

*

When the boiler places on vehicle, loading should be with crane.

*

Gates of the wehicle should be opened previously.

*

Make use of the supporting ring while loading boiler with crane.

*

Pass the crane buum hook from the supporting ring.

*

Make sure that hook pim is in safety.

*

Uphold the crane buum and take the space.

*

Slowly uphold the boiler that  bottom level should be 30-40cm up from the ground.

*

Keep away from sudden moves that would cause boiler to shake.

*

Move the boiler next  to vehicle in this way.

*

Lift the boiler from 30-40cm higher than the vehicle body and and take it down on

vehicle body correctly.

*

Remove the hook from crane supporting ring.

Attention

 : Boiler must be carried in vertical position, make use of the supporting ring. 

When the boiler lifted up with crane, there shouldn't any living being under the boiler. 

Boiler must 

be carried with its accessories installed on it. 

B) CARRYING BOILER ON VEHICLE

When the boiler is carrying with vehicle, it should be tied to vehicle strictly, supporting 

stuff which would prevent slipping, should be put around. Boiler should not carry with 

fragile, smashable and living beings. Top of the vehicle should be covered with canvas 

after placing boiler. Driver should  keep away from the sudden moves that would cause 

danger. 

C) UNLOADING THE BOILER TO THE PLACE OF USE

Boiler should not be placed in work or residence places, should be placed in a seperate

boiler room.

When unloading the boiler to boiler room, crane must be used again, points that stated in

Clause A, should be considered.

If the place of use is not appropriate for crane entrance, boiler should be unload in a

proper place and carry with rollers to the place intended.

Summary of Contents for 25 MKB-S

Page 1: ...KTEK INSTALLATION USE AND MAINTAINENCE GUIDE FOR AUTOMATIC 4PASS AND DOUBLE FUEL BOILERS 25 MKB S 40 MKB S 60 MKB S 25 MKBC 40 MKBC 60 MKBC kk 07 CE TS EN ISO 9001 2015 rev na 04 Please read Please ke...

Page 2: ...ATER FLOOD BOILER INSTALLATION SCHEMA 4 2 AIR CONNECTION 4 3 CHIMNEY CHIMNEY CONNECTION SCHEMA 5 TECHICAL FEATURES 6 CONTROL PANEL 7 FIRST OPERATION AND USE 7 1 FIRST BURNING 7 2 WARNINGS FOR USE 8 CL...

Page 3: ...Turkey and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and mai...

Page 4: ...is strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 C do not attempt to feed cold water to the...

Page 5: ...ndan ayarlayarak izleme imkan Opportunity for watching and setting feeding and waiting time on the electronic panel control Detritions on heating are minimised with the cast burning bunker Fan with qu...

Page 6: ...3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 6...

Page 7: ...tallations Boiler must be connected to a good drawing chimney and minimum quantity elbows should be used between chimney and boiler Boiler must be placed where has enough air for an efificient burning...

Page 8: ...water return pipe Attention should be paid to leave enough working space for service intervention boiler control and fuel feeding while installation Valve connection should be made on boiler water ent...

Page 9: ...of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra secu...

Page 10: ...BOILER INSTALLATION SCHEMA 10...

Page 11: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Page 12: ...e building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement...

Page 13: ...5 TECHNICAL SPECIFICATION 13...

Page 14: ...n setting condition setting value is shown in screen Fuel Waiting time setting button Sets the waiting period after fuel loading 04 255 sec Fuel feeding Time setting button Sets fuel loading period 04...

Page 15: ...prevents entrance of foreign materials big sized coal pieces inside the bunker and prevents damage to the reducer and loading spiral Also passes the proper size of coal which will burn easily and eff...

Page 16: ...ater decreases 5 C below set degree Running and stopping of circulation pump and fan can be followed by blinking leds on digital display on control panel Circulation pump will run automatically 3 seco...

Page 17: ...ich don t have air flow should be opened Air holes should be cleaned up by running fan free Electricity connection shoul be cut off before the maintainance Electricity chimney installation connections...

Page 18: ...10 ELECTRICITY SCHEMA 18...

Page 19: ...uel wet spilled stucked and can not be loaded Fuel is pumped down by applying pressure with an object Smoke comes from chimney connections There is H3 warning on control panel digital screen H1 warnin...

Page 20: ...e of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEHICLE...

Page 21: ...Seller Maktek Kazan Radyator Klima San A 10013 Sk No 14 A O S B i li ZM R Tel 0 232 328 21 06 07 08 Faks 0 232 328 04 86 www maktek com tr info maktek com tr...

Reviews: