4.2 AIR CONNECTION 

The area where the boiler is installed must always be suppplied with fresh air by using a 

window or a duct. In order for a boiler to burn safely and efficiently, fresh air is required. 

Otherwise once the burning starts, the oxygen level will drop causing the burning to be 

inefficient. In turn, this will result in formation of soot in the boiler and chimney and will require 

frequent cleaning.

 

4.3 CHIMNEY

 

The chimney that will be connected to the boiler must be private. The chimney must be 

connected to provide minimum draught. A boiler without chimney connection should not be 

operated. 

Chimney connection pipe and pipe systematic should be installed and checked by authorized 

people only. May we remind you that the biggest factor in boiler efficiency is chimney design 

and draught. 

Proper chimney connection pipe should not smaller than the boilers chimney diameter, vertical 

length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected 

to the chimney with minimum 10 degree of angle. 

We suggest not to use enamel stove pipes as it creates tar in chimney connection pipe or 

chimney system. 

In case of an elbow use in chimney connection, the elbows must be round with a wide angle. 

Quantity of an angle must be minimum 2 pieces. 

Chimney connection must be installed to allow demounting from the boiler and avoid gas 

leaking. 

Chimney connection pipe must not be extended to the outside and must be connected to a 

pipe. 

The contact of chimney connection pipe with flammable material must be avoided. 

Chimney connection pipe must not be pushed inside the chimney. 

The direction of the  pipe should not be changed, should there is a need ,it must be 

positioned  by 60 degrees. 

The chimney must be leak proof and air transperancy from inside and outside must be 

avoided. 

No other boiler or device must be connected to same chimney. This would decrease chimney 

draught and decrease  boiler efficiency. 

Parallel chimneys should have no  inter connection. 

 11 

Summary of Contents for 25 MKB-S

Page 1: ...KTEK INSTALLATION USE AND MAINTAINENCE GUIDE FOR AUTOMATIC 4PASS AND DOUBLE FUEL BOILERS 25 MKB S 40 MKB S 60 MKB S 25 MKBC 40 MKBC 60 MKBC kk 07 CE TS EN ISO 9001 2015 rev na 04 Please read Please ke...

Page 2: ...ATER FLOOD BOILER INSTALLATION SCHEMA 4 2 AIR CONNECTION 4 3 CHIMNEY CHIMNEY CONNECTION SCHEMA 5 TECHICAL FEATURES 6 CONTROL PANEL 7 FIRST OPERATION AND USE 7 1 FIRST BURNING 7 2 WARNINGS FOR USE 8 CL...

Page 3: ...Turkey and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and mai...

Page 4: ...is strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 C do not attempt to feed cold water to the...

Page 5: ...ndan ayarlayarak izleme imkan Opportunity for watching and setting feeding and waiting time on the electronic panel control Detritions on heating are minimised with the cast burning bunker Fan with qu...

Page 6: ...3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 6...

Page 7: ...tallations Boiler must be connected to a good drawing chimney and minimum quantity elbows should be used between chimney and boiler Boiler must be placed where has enough air for an efificient burning...

Page 8: ...water return pipe Attention should be paid to leave enough working space for service intervention boiler control and fuel feeding while installation Valve connection should be made on boiler water ent...

Page 9: ...of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra secu...

Page 10: ...BOILER INSTALLATION SCHEMA 10...

Page 11: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Page 12: ...e building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement...

Page 13: ...5 TECHNICAL SPECIFICATION 13...

Page 14: ...n setting condition setting value is shown in screen Fuel Waiting time setting button Sets the waiting period after fuel loading 04 255 sec Fuel feeding Time setting button Sets fuel loading period 04...

Page 15: ...prevents entrance of foreign materials big sized coal pieces inside the bunker and prevents damage to the reducer and loading spiral Also passes the proper size of coal which will burn easily and eff...

Page 16: ...ater decreases 5 C below set degree Running and stopping of circulation pump and fan can be followed by blinking leds on digital display on control panel Circulation pump will run automatically 3 seco...

Page 17: ...ich don t have air flow should be opened Air holes should be cleaned up by running fan free Electricity connection shoul be cut off before the maintainance Electricity chimney installation connections...

Page 18: ...10 ELECTRICITY SCHEMA 18...

Page 19: ...uel wet spilled stucked and can not be loaded Fuel is pumped down by applying pressure with an object Smoke comes from chimney connections There is H3 warning on control panel digital screen H1 warnin...

Page 20: ...e of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEHICLE...

Page 21: ...Seller Maktek Kazan Radyator Klima San A 10013 Sk No 14 A O S B i li ZM R Tel 0 232 328 21 06 07 08 Faks 0 232 328 04 86 www maktek com tr info maktek com tr...

Reviews: