Maktek 25 MKB-S Installation Use And Maintainence Manual Download Page 15

 

15

 

ATTENTION !!!

 Fuel loading and feeding values are in Table 1. Loading and feeding settings 

belongs to the fuel only which one used in. It is necessary to do new settings when the fuel type 

is changed

 

SAFETY TERMOSTAT 

  Safety termostat is placed behind the control panel and steps in 

breakdown  of  boiler  water  setting  termostat    and  prevents  the  increase  of  boiler water 

temperature.  Ensures  secondary  safety  and  protects  the  boiler.  Recommended to be set at  

80 °C.

IMPORTANT!!!

 

When any adjustment is not being made on digital display, it shows the boiler water temperature 

at that time. 

7. FIRST OPERATION AND USE

7.1 First Burning

 

In first burning, system water must be full and system  air must be vented. 

Fuel loading must be done over the grate. Grate prevents entrance of foreign materials, big 

sized coal pieces inside the bunker and prevents damage to the reducer and loading spiral. 

Also passes the proper size of coal which will burn easily and efficiently into the bunker. 

Small wood pieces must be ignited with gas and paper for burning the fuel in boiler. Then boiler 

gates must be closed and fan must be runned in low speed till full ignition of coal. If fan blows 

too much air, slagging of the fuel occurs because of the cooling affect of  the combustion 

chamber.

 

Make the fuel feeding and waiting settings according to boiler and fuel type  from the 

Table 1: 

When the ignition is complete, make the reductor button on and  make the boiler run with 

settings you desire. 

Increase the fan speed after ignition and provide the fuel efficiently. 

It would be good to set the boiler water temperature at a high degree (70°C) from control panel. 

Afterwards this temperature can be set to desired degree. 

Summary of Contents for 25 MKB-S

Page 1: ...KTEK INSTALLATION USE AND MAINTAINENCE GUIDE FOR AUTOMATIC 4PASS AND DOUBLE FUEL BOILERS 25 MKB S 40 MKB S 60 MKB S 25 MKBC 40 MKBC 60 MKBC kk 07 CE TS EN ISO 9001 2015 rev na 04 Please read Please ke...

Page 2: ...ATER FLOOD BOILER INSTALLATION SCHEMA 4 2 AIR CONNECTION 4 3 CHIMNEY CHIMNEY CONNECTION SCHEMA 5 TECHICAL FEATURES 6 CONTROL PANEL 7 FIRST OPERATION AND USE 7 1 FIRST BURNING 7 2 WARNINGS FOR USE 8 CL...

Page 3: ...Turkey and World market Our company which has acquired advanced technology and superior quality stands on in accordance with these principles This handbook is a helpful guide during operation and mai...

Page 4: ...is strictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 C do not attempt to feed cold water to the...

Page 5: ...ndan ayarlayarak izleme imkan Opportunity for watching and setting feeding and waiting time on the electronic panel control Detritions on heating are minimised with the cast burning bunker Fan with qu...

Page 6: ...3 SECTIONS OF THE BOILER See techic table for dimensions stated with letters 6...

Page 7: ...tallations Boiler must be connected to a good drawing chimney and minimum quantity elbows should be used between chimney and boiler Boiler must be placed where has enough air for an efificient burning...

Page 8: ...water return pipe Attention should be paid to leave enough working space for service intervention boiler control and fuel feeding while installation Valve connection should be made on boiler water ent...

Page 9: ...of hot water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra secu...

Page 10: ...BOILER INSTALLATION SCHEMA 10...

Page 11: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Page 12: ...e building if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement...

Page 13: ...5 TECHNICAL SPECIFICATION 13...

Page 14: ...n setting condition setting value is shown in screen Fuel Waiting time setting button Sets the waiting period after fuel loading 04 255 sec Fuel feeding Time setting button Sets fuel loading period 04...

Page 15: ...prevents entrance of foreign materials big sized coal pieces inside the bunker and prevents damage to the reducer and loading spiral Also passes the proper size of coal which will burn easily and eff...

Page 16: ...ater decreases 5 C below set degree Running and stopping of circulation pump and fan can be followed by blinking leds on digital display on control panel Circulation pump will run automatically 3 seco...

Page 17: ...ich don t have air flow should be opened Air holes should be cleaned up by running fan free Electricity connection shoul be cut off before the maintainance Electricity chimney installation connections...

Page 18: ...10 ELECTRICITY SCHEMA 18...

Page 19: ...uel wet spilled stucked and can not be loaded Fuel is pumped down by applying pressure with an object Smoke comes from chimney connections There is H3 warning on control panel digital screen H1 warnin...

Page 20: ...e of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEHICLE...

Page 21: ...Seller Maktek Kazan Radyator Klima San A 10013 Sk No 14 A O S B i li ZM R Tel 0 232 328 21 06 07 08 Faks 0 232 328 04 86 www maktek com tr info maktek com tr...

Reviews: