P 8/ 16
R
epair
[3] DISASSEMBLY/ASSEMBLY
[3]-3. Chamber (cont.)
ASSEMBLING
Assemble Cylinder rings to Cylinder so that
the angle of the two notches is more than 90 degrees.
Cylinder ring (2pcs.)
(1) Assemble Cylinder rings to Cylinder as illustrated in Fig. 15.
Note: Apply the specific lubricants in accordance with the instruction shown in Fig. 1.
Cylinder
(2) Put Chamber seal ring on the edge of Chamber, and assemble Chamber top to Chamber by fastening with M4x16
Hex socket head bolt (4pcs.). Refer to the right illustration in Fig. 14.
(3) Setting Arm connector to Arm, assemble them to Cylinder. Refer to the left illustration in Fig. 14.
(4) Assemble Stop rubber and Compression spring 8 to Cylinder. Refer to the right illustration in Fig. 13.
(5) Applying Molybdenum disulphide lubricant to the outside of Cylinder (
Fig. 1), insert it into Chamber.
Refer to right illustration in Fig. 13.
(6) Connect Cylinder with Chamber as illustrated in Fig. 16.
Fig. 15
Fig. 16
Spring Pin 3-32
Water pump pliers
Insert Spring pin 3-32 for approx. 5mm depth
with aligning two holes of Chamber with those of
Cylinder for Spring pin 3-32.
And then, set Spring pin 3-32 in place with water
pump pliers.
Insert the other Spring pin 3-32 in the same manner.
(7) Inserting Cylinder section into Housing, tighten Front plate with M5x16 Hex socket head bolt (3pcs.). Refer to Fig. 4.
(8) Assemble Contact top and Arm plate. Refer to Fig. 4.
(9) Assemble Handle set to Housing. Refer to Fig. 2.