background image

27

DVRTSB Bay Window Fireplace

10003848

 

Fuel Conversion Instructions

The conversion of this appliance from one 
gas to another must be carried out by a 
qualified service technician.

1.  Disconnect power to unit and shut off the gas supply.
2.  Remove the glass (Refer to “Glass Removal” Sec-

tion.)

3.  Carefully remove the logs & lava rock material.
4.  Remove the screws that are holding the burner 

housing in place.

5.  Remove the burner housing. On this model you may 

need to loosen the pilot bracket retaining screw/nut 
and tilt pilot and bracket assembly to gain sufficient 
clearance to remove the burner housing.

6.  Remove front and rear orifice and replace with ori-

fice supplied in the conversion kit. 

7. 

SIT top Convertible Pilot

 

  Gently lift off pilot hood from the pilot. (Do not 

remove the spring clip holding the hood in place). 
Using a size 5/32” Allen key unscrew the exposed 
orifice. Insert the new orifice supplied in the kit, do 
not over tighten the orifice. Replace the pilot hood 
ensuring the index tab aligns with the notch on the 
hood.

 

PSE Pilot

  Using a suitable wrench on hexagonal body unscrew 

the pilot hood assembly from the pilot, do not twist 
the hood itself. Remove the orifice and replace it 
with the new orifice supplied in the kit. Refit the pilot 
hood assembly. Do not over-tighten the pilot hood. 
The hood must return to its original alignment. Take 
care not to damage the thermocouple, thermopile or 
igniter.

8. 

SIT 820 NOVA Gas Control Valve

 (Fig. 11)

  a) Using a Torx T20 or slotted screwdriver, remove 

and save three pressure regulator mounting screws 
(A), pressure regulator tower (B) and diaphram (C). 

  b) Ensure the rubber gasket (D) is properly posi-

tioned and install the new HI/LO pressure regulator 
to valve using the new screws (E) supplied with the 
kit. Tighten screws securely. (Reference torque - 25 
in.LB) 

  c) Install the enclosed identification label (F) to the 

valve body where it can be easily seen. 

  Honeywell Gas Control Valve

 (Fig. 12)

  The Honeywell valve fitted to this unit is suitable for 

use with LP or Natural Gas. It is converted to re-
quired gas application by the installation of a color 
coded “conversion screw”. 

  a. Using a suitable small screw-driver lift out the 

central regulator cap from the “HI/LO” knob on the 
valve.

  b. Unscrew the exposed conversion screw.
  c. Insert the new color coded conversion screw. Do 

not over-tighten the screw, it must be fingertight.

  d. Refit the regulator cap.
  e. Mount conversion label supplied with conversion 

screw to valve in a visible position.

9.  Reassemble 

fireplace in 
the reverse 
order, except 
for front 
glass. Leave 
this off until 
after unit 
has been 
checked for 
leaks and 
the gas sup-
ply has been 
bled.

10.  After bleed-

ing gas line 
and check-
ing for leaks with a soap solution, replace the front 
glass. Fire up the unit, check for flame impingment 
on logs, adjusting them if necessary. Check manifold 
and supply pressures. Make sure screws are tight-
ened after checking pressure.

The procedure for converting from one gas 
to another is the same regardless of the 
initial gas used. The only variation is in the 
orifice sizes and component part numbers. 
Your authorized service provider will en-
sure correct parts are used.

LOH

I

HV120

Honeywell valve 

conversion

9/24/02  djt

Regulator Cap

Conversion 

Screw

Pressure 

Regulator 

Housing

HV102

Fig. 46

  Honeywell gas valve.

Fig. 45   

NOVA SIT820 gas valve.

FC107

SIT820

valve conversion

10/03   

A

B

C

OFF

PIL

OT

O

D

E

F

FC108

SIT

regulator

conversion

10/03

OFF

PIL

OT

O

FC107

FC108

Summary of Contents for DVRTSB

Page 1: ...or s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the re department DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND OR LIQUIDS IN THE VICINITY OF T...

Page 2: ...Grade Installation 17 Vertical Through the Roof Applications Installation 18 Vertical Through the Roof Installation 18 Twist Lock Vent Components 20 Operating Instructions Glass Information 21 Louvre...

Page 3: ...em chimney of this replace should be checked at least once a year and if needed your venting system should be cleaned 8 Keep the area around your replace clear of com bustible materials gasoline and o...

Page 4: ...Box Inlet 3848 Fig 2 Fireplace speci cations and framing dimensions Ref DVRTSB Top Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17 444 mm H 24 610 mm I 5 139 mm J 2 61 m...

Page 5: ...alled as Rear Vent 3848 Gas Line Inlet EB1 Box Inlet Fig 3 Fireplace speci cations and framing dimensions Ref DVRTSB Rear Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17...

Page 6: ...stance between the mantel leg if tted and the replace For the correct mounting height and widths refer to Figure and the Mantel Chart below Noncombustible mantels and legs may be installed at any heig...

Page 7: ...urisdiction for installations at elevations above 4 500 feet 1 370m Units B02A01 B02B01 Gas Line Installation When purging the gas lines the front glass must be removed The gas pipeline can be brought...

Page 8: ...e socket assembly 6 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 7 Re t the socket assembly back into the electrical box and replace the cover pl...

Page 9: ...e intake box and remove the cover and gasket Fig 11 5 Remove four 4 screws securing the ue pipe to back of the intake box and remove pipe and gasket Fig 11 6 Secure the plate and gasket removed in Ste...

Page 10: ...ng Horizontal venting must be installed on a level plane without any incline or decline There must not be any obstruction such as bushes gar den sheds fences decks or utility buildings within 24 from...

Page 11: ...m 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other ap...

Page 12: ...this is not mandatory with twist lock pipe NOTE For ease of assembly use a lubricant Vaseline or similar substance on male end of twist lock pipe prior to assembly Outside Corner Inside Corner Termin...

Page 13: ...zontal distance between the rear of the appliance and the outside face of the rear wall is 20 508mm Fig 16 The minimum clearances between any combustible material and the vent pipe sections are Top 2...

Page 14: ...l help to deter mine the various dimensions allowable Minimum clearance between vent pipes and combustible materials is one 1 25mm on top bottom and sides unless otherwise noted When the vent terminat...

Page 15: ...each 45 elbow installed in the horizontal run the length of the horizontal run MUST be reduced by 18 45cm This does not apply if the 45 elbows are installed in the vertical part of the vent system The...

Page 16: ...level plane STEP 6 Use appropriate length of pipe sections telescopic or xed and install The section which goes through the wall is packaged with the starter kit and can be cut to suit if necessary S...

Page 17: ...he soil If the foundation is recessed use recess brackets not supplied for securing lower portion of the snorkel Fasten brackets to wall rst then secure to snorkel with self drilling 8 x 1 2 sheetmeta...

Page 18: ...ng Fig 33 9 Install storm collar and seal around the pipe Fig 33 10 Add additional vent lengths for proper height Fig 31 The enlarged ends of the vent section always face downward 11 Apply high temper...

Page 19: ...e ceiling level a 7DVAIS Attic Insulation Shield must be installed TWL101a Twist Lock Pipe 2 8 99 djt 3 5 Sheet Metal Screws per Joint Sealant Storm Collar TWL101a Fig 33 Roof ashing FP1029 attic insu...

Page 20: ...ible length Pipe sections for vertical or horizontal venting Model 7TDVP8 4 per box Model 7TDVP12 4 per box Model 7TDVP24 4 per box Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS Attic Insula...

Page 21: ...e of frame out slightly and lift glass frame assembly up and away from the replace Fig 36 7 To reinstall the glass panel reverse this procedure Operating Instructions Glass Information Glass Frame Rem...

Page 22: ...of the base Fig 38 FP1393 Fig 38 DVRTSB ceramic panels The logs can be identi ed by the number cast into their underside The logs must be correctly placed in the order described for the correct operat...

Page 23: ...r units equipped with HI LO valves the ame adjustment is accomplished by rotating the HI LO adjustments knob located near the center of the gas control valve Figs 41 42 Turn counterclockwise to decrea...

Page 24: ...E LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any...

Page 25: ...r wire accross terminals at wall switch if burner comes on replace defective wall switch If okay jumper wires across wall switch wires at valve if burner comes on wires are faulty or connections are b...

Page 26: ...Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connections Replace Thermopile Thermocouple Needs A Min Of 14m...

Page 27: ...is properly posi tioned and install the new HI LO pressure regulator to valve using the new screws E supplied with the kit Tighten screws securely Reference torque 25 in LB c Install the enclosed iden...

Page 28: ...illivolt gas valve Most of these components may require only an oc casional checkup and cleaning and some may require adjustment If repair is necessary it should be per formed by a quali ed technician...

Page 29: ...1 49 50 52 38 62 39 42 37 63 41 63 36 3848 DVRTSB parts 7 03 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time...

Page 30: ...Pilot Tube w Fitting SIT not shown 10001296 15a Ori ce Pilot PSE Nat not shown 10001822 15b Ori ce Pilot PSE Prop not shown 10001823 16a Ori ce Pilot Top Convertible Nat not shown 10002268 16b Ori ce...

Page 31: ...ry Lining Rear Wall Right 10003888 49 Refractory Lining Floor Left 10003890 50 Refractory Lining Floor Right 10003891 51 Refractory Lining Floor Front 10003892 52 CR Floor Kit w o Rear 10003889 53 Air...

Page 32: ...nected in two ways Method A Route the 6 lead tted to the unit to a conveniently located wall socket Method B The EB I receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is t...

Page 33: ...on trol FP1025 Fig 49 FK24 fan wiring The replace when installed must be electrically connected and grounded in accordance with local codes or in the absence of local codes with the current CSA C22 1...

Page 34: ...34 DVRTSB Bay Window Fireplace 10003848...

Page 35: ...hop Ifuponinspection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of...

Page 36: ...f ciency Fan OFF Fan ON AFUE DVRTSB RN 58 4 81 82 64 DVRTSB RP 58 4 82 83 64 DVRTSB RFN 58 4 81 82 64 DVRTSB RFP 58 4 82 83 64 DVRTSB EN 60 4 81 82 64 DVRTSB EP 60 4 82 83 64 410 Admiral Blvd Mississa...

Reviews: