Installation Preparations
MyPower S6600 Series Routing Switch Installation Manual
6
copyright
©
2015 Maipu All rights reserved.
board comprises the carton, plastic bags, protection EPE and other packaging
materials. The open-package steps are as follows:
Step 1:
View the carton label, and confirm the board model in the carton.
Step 2:
Use a paper knife to gash the tape along the lid commissure; be careful when using
the knife and do not insert too deep to avoid damaging equipment inside.
Step 3:
Open the carton, and get out the board protection EPE box.
Step 4:
Wear the anti-static wrist, un-packing the anti-static bag, get out the board and
check whether the board has the obvious damage.
Step 5:
Check the board type and quantity in the carton according to the packing list.
F
F
F
F
I G U R E
I G U R E
I G U R E
I G U R E
2
2
2
2
2
2
2
2 O
O
O
O
P E N
P E N
P E N
P E N
----
P A C K A G E
P A C K A G E
P A C K A G E
P A C K A G E D I A G R A M
D I A G R A M
D I A G R A M
D I A G R A M O F
O F
O F
O F T H E
T H E
T H E
T H E I N D E P E N D E N T
I N D E P E N D E N T
I N D E P E N D E N T
I N D E P E N D E N T B O A R D
B O A R D
B O A R D
B O A R D
�
In the independent board packing box, only the packing box of the MPU card
contains the memory.
�
Keep the accessories and memory in the accessory box and do not lose.
�
The MPU card can be used normally only when being installed with the