background image

Step 2. 

Install UV-C bulbs and purifier

Install UV-C bulbs

1. 

Two replaceable UV-C bulbs are shipped with this unit. Carefully 

remove bulbs from their packaging. 

2. 

Insert one bulb into each of the two bulb sockets located behind the 

front facing plate. 

Handle carefully, from the bulb base, and avoid touching the glass.

 

3. 

Slide the socket end of each bulb, through the oval opening in the back 

plate. Align and insert bulb socket pins with the socket pin holes at the 

front plate of the unit. 

4. 

Apply firm gentle pressure to ensure full socket connection.  

Snap the bulb into the clear bulb retainer clip.

Install Purifier

1. 

This unit ships with one replaceable activated carbon/potassium 

permanganate purifier (AC/PP).  

Locate the purifier and remove from its protective package. 

2. 

Remove six screws to permit AC/PP access plate removal, exposing the 

purifier opening and track.

3. 

Insert the AC/PP purifier into the track and slide all the way to the back 

of the unit. (There is no preferred flow direction for the purifier)

4. 

Replace the AC/PP access plate and six screws. 

NOTE:

 Purifier is packaged separately to prevent 

exposure and damage during shipping.

Step 3. 

Determine the Mounting Location

Ensure the ductwork in the mounting location is 

deep-enough to accommodate the length of the unit.

The Qwik

Pure

 

TripleGuard

™ purifier can be mounted horizontally, vertically, or at any angle 

in-between. 

Do not install upside down, air flow must pass thru the AC/PP purifier last.

Maximum performance is achieved when the Qwik

Pure

 

TripleGuard

™ is located in the 

air plenum just after (downstream of) the air handling unit. This is the supply or post-

evaporator air side of the air handler, not the return air side. This unit does not replace 

the traditional air filter located on the return side of the air handler whose purpose is to 

filter out particulate matter and dust.

Because you will be cutting into the supply duct, we recommend mounting Qwik

Pure

 

TripleGuard

™ Air Purifier in the supply duct, not the sheet metal of the air handler to 

avoid any potential damage to components inside the air handler. When considering a 

mounting location, consider the power source location—typically the power source is 

the air handler itself. 

The Qwik

Pure

 

TripleGuard

™ Air Purifier can operate on any AC voltage between 120 

and 240 volts. Typically, residential AC air handlers and heat pumps operate on 240 Volts 

AC and furnaces operate on 120 VAC. 

The electrical connection should be performed 

by a licensed electrician.

 Fuses are suppled to provide over-current protection. 

When considering a mounting location, remember the AC/PP oxidizing purifier is to 

be changed annually, so ensure there is ample space to slide the  purifier out of the 
Qwik

Pure

 

TripleGuard

™ without any obstructions limiting the travel.

CLEAR

BULB RETAINER CLIP

Summary of Contents for QwikPure TripleGuard QT2730

Page 1: ...Engineering Corporation Installation Instructions An advanced triple protection whole house air purification system uses three proven methods to ensure air sanitization XUV C Light XPhotocatalytic Oxi...

Page 2: ...2020 Mainstream Engineering Corporation 200 Yellow Place Rockledge FL 32955 How it Works Viruses and Bacteria Phi X174 bactierophage and Escherichia coli...

Page 3: ...led into the ductwork of air conditioning and heat systems HVAC systems where most sick building problems originate Unlike many air purifiers QwikPureTripleGuard uses three methods to clean sanitize a...

Page 4: ...NSTALLEDBYPROPERLYTRAINEDANDLICENSEDHVACTECHNICIANS ITISTHETECHNICIAN SRESPONSIBILITYTOPROPERLYINSTRUCTTHEHOMEOWNER OFTHEDANGERSOFLOOKINGDIRECTLYATTHELIGHTEMITTEDFROMTHEUNIT Step 1 Verify the contents...

Page 5: ...ipleGuard purifiercanbemountedhorizontally vertically oratanyangle in between Do not install upside down air flow must pass thru the AC PP purifier last Maximum performance is achieved when the QwikPu...

Page 6: ...old the mounting flange against the duct board studs pointing toward the duct board and orient to preferred mounting point 2 Apply enough pressure to cause the mounting plate studs to dent mark the du...

Page 7: ...240 VAC We suggest that the power be drawn from the air handler or furnace power source downstream of the air handler or furnace breaker however any AC power source from 120 to 240 VAC can be used Th...

Page 8: ...g by verifying the GREEN LED and two ORANGE LEDs are illuminated If the GREEN LED is not illuminated there is either no electrical power being supplied to the unit check the fuses or the electronics c...

Page 9: ...550 or 1 321 631 3550 If the Next Service sticker is indicating that it is time to replace the UV C bulbs change them even if they are still working as indicated by the ORANGE LEDs being illuminated I...

Page 10: ...ifier was mounted on a metal surface use the existing self tapping screws to secure the unit directly to the sheet metal surface If the QwikPure TripleGuard Air Purifier was mounted on a duct board su...

Page 11: ...isclaimer of Warranties Company s Products must be stored handled installed used and maintained in accordance with instructions provided by Company and this Limited Warranty is conditioned upon compli...

Page 12: ...oration 200 Yellow Place Rockledge Florida 32955 CONTACT info qwik com www qwik com CALL FOR SUPPORT 1 800 866 3550 or 1 321 631 3550 QwikProducts QwikPure TripleGuard are trademarks and Mainstream En...

Reviews: