Step 5.
Install the
Qwik
Pure
TripleGuard
™
Air Purifier
If mounting on a duct board surface:
Insert the Qwik
Pure TripleGuard
™ into the duct, using the four remaining mounting
studs to locate the Qwik
Pure TripleGuard
™ unit.
Secure the
Qwik
Pure Triple Guard™
to the mounting flange studs with the four wing nuts supplied.
If mounting on a metal surface:
a.
Hold the exterior mounting flange against the metal duct and cut an opening
along the inside opening of the flange. Before cutting, make certain the Qwik
Pure
TripleGuard
™ will fit in the planned space. (see Figure 1). Cut an opening along
the inside opening of the flange.
b.
Discard the mounting bracket. Using self-tapping sheet metal screws, secure the
Qwik
Pure
TripleGuard
™ directly to the sheet metal surface.
Step 6.
Connect to a Power Source
For optimal performance and maximum bulb life, operate the Qwik
Pure
TripleGuard
™
continuously. However, using a relay (activated by the G and common wires), the
Qwik
Pure
TripleGuard
™ can also be operated only when the indoor blower is operating.
The Qwik
Pure
TripleGuard
™ can be connected to any AC power source between
120
and 240 VAC
. We suggest that the power be drawn from the air handler or furnace
power source downstream of the air handler or furnace breaker however any AC power
source from
120 to 240
VAC
can be used.
The electrical connection should be performed by a licensed electrician and
conform to local electrical codes.
A rubber grommet is provided. Use the grommet to seal and protect the power cord
as it passes through the sheet metal of the air handler. The securing strap is used to
prevent any strain on the power cord. Drill a ½" diameter hole to accept the grommet
into the sheet metal.
The power source must be fused. Two fuse cases with fuses are supplied. If connecting
to
120 VAC
, then only one fuse assembly on the hot (black)wire is needed. However, if
connecting to
240 VAC
both lines are hot, so a fuse is provided for each lead. Connect
these fuses between the air handler power source and the Qwik
Pure
TripleGuard
™
power lead, downstream of any air handler disconnect.
Ensure the green ground wire is properly grounded.
Step 7.
Verify proper operation
f
After successfully completing the previous steps, turn the unit on.
f
The
GREEN LED
should be illuminated indicating proper power to the unit.
f
The two
ORANGE LED
s should be illuminated indicating both UV-C bulbs are
operating properly.