Supplied By www.heating spares.co Tel. 0161 620 6677
MY99004A
Securing Nuts &
Washers
Flue
Terminal
Sealing
Strip
Rear View
Of Water
Heater
Sealing
Strip
12
Part No. 5000893
Installation
Fig. 13
7. Fit the flue terminal sealing strip (packed
separately in the carton) into the recess
around the flue aperture in the back of
the appliance.
8. Lift the appliance into position, locating
the flue outlet into the circular duct on the
flue terminal.
9. Secure with the appropriate nuts and
washers.
3.2
Gas Connection
The meter and supply pipes must be capable
of delivering this quantity of gas in addition to
the demand from any other appliances in the
house and must be governed at the meter.
The pipe diameter required will depend on
the distance from the gas meter and the
number of bends used.
The gas installation should be in accordance
with the relevant standards. In GB this is BS
6891. In IE this is the current edition of I.S.
813 "Domestic Gas Installations".
1. Assemble the filter,
‘
O
’
ring and inlet tail
to the gas inlet.
2. Depending on whether the main supply
pipe is to be routed vertically or
horizontally to the appliance, connect the
gas service cock (stamped 'GAS') either
directly to the gas inlet tail or within the
supply pipe.
Note:
The service cock should be as
close to the appliance as possible and
the ON/OFF screw in an accessible
position.
3. Ensure that the gas supply is isolated.
4. Connect to the gas supply.
5. Turn the gas supply on and purge
according to; in GB BS 6891 and in IE the
current edition of I.S. 813
“
Domestic Gas
Installations
”
.
IMPORTANT: DO NOT TRY TO LIGHT
THE APPLIANCE AT THIS STAGE. TO
ALLOW THE MAIN BURNER TO
IGNITE WITHOUT THE OUTER CASE
SECURED IN POSITION IS A HAZARD.
Fig. 12