9 Mounting preparations
13
12
Main duct (steel folded spiral-seams
duct)
13
Spigot
14
Shaft wall
15
Ceiling compound
16
Floor ceiling
19
Steel threaded rod / stair bolt
20
Duct attachment
21
Duct clamp / clamping band
22
Steel folded spiral-seams duct
23
Wall/board seal
24
Suspended ceiling
25
Steel screws or steel blind rivets (3 of
each)
26
Steel duct bend
27.1
Anchor bolt / steel dowel
27.2
Metal expansion dowel
28
Retaining bolt with nut
29
Retaining bolt
30
Steel clamping band
Keep a maximum distance of 1.5 m between
the duct fastenings. It is essential to observe
the installation instructions: Mounting prepara-
tions [
Duct attachment with duct clamp,
alternatively duct attachment with clamping
band
Danger due to fire transmission
DANGER Danger to life due to fire trans-
mission if an incorrect connection duct is
used on the APB housing when installed in
the ceiling.
Always use steel folded spiral-seams ducts for
the connection.
DANGER Danger to life due to fire trans-
mission in case of faulty ceiling compound.
It is essential that the remaining gap between the
main duct and the wall or ceiling is completely
sealed with non-flammable materials that are res-
istant to deformation. For example, use concrete
or cement mortar.