BA052301-en
45
Example 1
Example 2
V
t
= 5.547 x 5000 x 0. 0363 x 1.2 x 500/273
x 1.0
V
t
= 18.273 x 2300 x 0,.0363 x 1.2 x 500/273
x 1.5
V
t
= 2212.71 m³/h
V
t
= 5029.49 m³/h
3.2.3
Fresh Air Supply for the Test Room
According to currently effective regulations in the Federal Republic of Germany, the air must be
renewed 10 to 15 times per hour in closed testing rooms with a surface area up to 100 m².
The air must be renewed 5 to 8 times per hour in rooms over 100 m².
An air throughput of approx. 5000 m³/h is required for a surface area of 100 m².
An inadequate fresh-air supply increases the burden on the test personnel and distorts the test
results.
4
Transport and Storage
Check package to ensure it is complete, in accordance with the order confirmation. Report any
transport damage to the carrier immediately.
During loading, unloading and transport always use suitable lifting equipment, material handling
equipment (e.g. cranes, forklifts, etc.) and the right load handling attachments and slings. Al-
ways ensure that the parts to be transported are suspended or loaded properly so that they
cannot fall, taking into account size, weight and the centre of gravity.
Store the packages in a covered area, protected from direct sunlight, at a low humidity and with
temperatures between 0...40 °C
(32…104
°F). Do not stack packages.
When unpacking, take care to avoid any possibility of injury or damage. Keep at a safe distance
when opening the package strapping, do not allow any parts to fall out.
5
Installation and Initial Operation
Installation and initial operation of the equipment may be done only by authorized and trained
service technicians provided by the manufacturer, licensed dealers or service partners.