23
BA082901-en
5.9
Routing the Manual Lowering Rope on Lifts with Power Unit in Middle
Platform
5.9.1
Manual Lowering Rope with 5.5 kW Unit in Middle Platform
1 When commissioning for the first time, remove the wire rope from the lowering
valve +C-M2 in direction of the pull.
2 Remove the wire rope from the middle platform at the side, and guide it below the
lifting floor.
3 Wind the end of the wire rope to a loop. Fasten the wire rope loop to the inside of
the lift floor plate with a cable and an adhesive clamp.
IMPORTANT: Avoid
mechanical stress (no strain) when fastening!
4 When using the emergency lowering device, remove the wire rope from the
attachment and leave the hazard area. Activate lowering valve +C-M2 via the wire
rope.
2
3
4
1
Summary of Contents for DUO CM Series
Page 27: ...27 BA082901 en A M1 B M1 C M4 A C M4 B C M2...
Page 29: ...29 BA082901 en C M5 A C M4 B C M4 A C M5 B Hand pump...
Page 31: ...31 BA082901 en A M1 B M1 C M2 C M4 A C M4 B...
Page 33: ...33 BA082901 en C M5 A Hand pump C M4 B C M4 A C M5 B Stopcock Buttons...
Page 35: ...35 BA082901 en A M50 A B M50 B C M54 A C M54 B...
Page 37: ...37 BA082901 en A M50 A B M50 B Stopcock Buttons...