Using a PT Controller: Operation/Monitoring
©
2017 Sensata Technologies
Page 141
Figure 12-8, PT Charge Controller SETUP2 Menu Map
SETUP
07E PT Relay VDC x7
Eng =20.0V/ 10sec
Dis =28.0V/ 10sec
C0# View PT SETUP
R
OFF, 1-60 Min
R
R
07F PT Relay SOC x7
Engage SOC = 50%
Disengage SOC =100%
C0# View PT SETUP
07G PT Alarm x7
ON =20.0V/ 10secs
OFF =28.0V/ 10secs
C0# View PT SETUP
07H PT Power Save x7
Display = OFF
C0# View PT SETUP
Continued
R
Engage = 20-99%
Disengage = 20-100%
VDC = 16.0-34.0
Delay = 0-127Sec,
1-127MIn
VDC = 16.0-34.0
Delay = 0-127Sec,
1-127Min
P
P
P
P
07E PT Relay VDC x7
Eng =20.0V/ 10sec
Dis =28.0V/ 10sec
C0# Select PT SETUP
07F PT Relay SOC x7
Engage SOC = 50%
Disengage SOC =100%
C0# Select PT SETUP
07G PT Alarm x7
ON =20.0V/ 10secs
OFF =28.0V/ 10secs
C0# Select PT SETUP
07H PT Power Save x7
Display = OFF
C0# Select PT SETUP
Note:
C0#
(blinking) = Shows data for the PT controller number
(determined by the assigned DIP switch number inside that PT) that appears on the router’s
display. Rotate the SELECT knob to view/edit data for any additional connected controller(s).
Summary of Contents for ME-ARTR
Page 1: ...ME ARTR Advanced Router Owner s Manual Version 4 0 ...
Page 181: ...NOTES ...