![Magnetic Autocontrol MPT 33 Operating Instructions Manual Download Page 12](http://html1.mh-extra.com/html/magnetic-autocontrol/mpt-33/mpt-33_operating-instructions-manual_3576844012.webp)
Operating Instructions
581E,5811_07
12
5
.
Assembly and installation
5.1 To fit the turnstile (above ground foundation)
The turnstile should be positioned in its desired location taking care on
which side (right or left) you want to place part 2. (See Fig. 2.1/ 2.2, Fig. 6 )
This is important in case you want to mount access control units at part 2.
Set Foundation drillings 7 x M16 as per drilling plan figure 3!
Use the provided drilling template
Mount threaded rod (see enclosed separate description)
Wait till bolts are cured (see separate description)
Mount the components in correct order (part 1, 2..) onto the foundation,
however, do not tighten entirely the bolts in order to compensate any drilling
offset which may occur afterwards. Use screws 6 x M 10 x35. Grease the
screws before.
Place part 3 upon part 1 and 2. Use screws 8 x M12 x 35 and counternut.
This part of installation is dangerous. Make sure, that nobody stays
under Part 3, until this part is securily fixed.
Mount lower bearing (see fig. 8). Using screws M10 x 70. Grease them
before.
Put part 4 on the lower bearing,
see fig. 10 and 11
and screw it up by means
of 4 x M16 x 40 with U-discs and flange. Be sure that the turnstile is in locked
position. (Please consider the marking of the flanges!) see fig. 12
Now tighten all fixing bolts.
part 3
part 1
part 2
part 4
Fig.6
Note:
Part 3 should be mounted, that
the cover is to open from the
secure side (inside).