Pedestrian Pivot Barrier
MPP-112 / MPP-122 / MPP-132 / MPP-212 / MPP-222
Start-up and operation
60
5817,0016EN / Version 00
10.2 Start-up
Inspection prior to initial start-up
The following inspections must be performed prior to initial start-up:
Check wiring emergency input IN1 and IN4.
See page 45, chapter 8.4.1.
Check connection of digital inputs IN2 and IN3.
See page 45, chapter 8.4.1.
Check connection of relays outputs 1 to 6.
See page 46, chapter 8.4.2.
10.3 Operation
10.3.1 Switching on and off the pedestrian barrier
Switching on
Switch on pedestrian barrier by the mains switch in the upper
housing part.
See also page 43, Fig. 16.
Switching off
Switch off pedestrian barrier by the mains switch in the upper
housing part.
See also page 43, Fig. 16.