The package contains 2 cutting units, 2 fence units and a box containing different accessories, please see figu-
res below:
11. OPERATING AREA
In order to use the machine correctly, you must ensure the clearance areas indicated belowi.
Pag. 8
Ø 4 mt
12. MACHINE INSTALLATION AND CHECK PROCEDURE
The boring machine is packaged in a wooden crate. Given the size of the package, please han-
dle it correctly, paying utmost attention. After bringing the package next to the area in which you
want to place the machine, remove the crate.
Summary of Contents for 16271400
Page 2: ...This page intentionally left blank...
Page 4: ...This page intentionally left blank...
Page 7: ......
Page 38: ...1 26273000 Pag 31...
Page 40: ...Pag 33 2 26272100...
Page 42: ...3 26271200 Pag 35...
Page 44: ...Pag 37 4 26271301...
Page 46: ...Pag 39 5 26271300...
Page 48: ...Pag 41 6 26271400...
Page 50: ...7 26272500 Pag 43...
Page 52: ...8 26271600 Pag 45...
Page 54: ...9 262517 Pag 47...
Page 56: ...Pag 49 10 26054810...
Page 58: ...PNEUMATIC SYSTEM Pag 51...