www.madur.com
Manual
GA-21Plus
-
in the
GAS
line. Confirm standard gas editing. Sup-
ply the instrument with standard gas for about 4 min.
-
in the
STORE
line, as soon as the value has stabil-
ised, stores the measured value as calibration value.
Disconnect the standard gas and flood the instru-
ment for at least 15 min with ambient air.
-
return to select the next gas, or end the calibration
42