Macurco CD-6B Manual (Rev-1.0) Eng
REV – 1.0
[34-2900-0510-2 ]
9
|
P a g e
Figure 3-3 CD-6B Typical Installation wiring diagram
Figure 3-4 CD-6B Typical Installation Layout
NOTE
: The detector should be mounted as close to the primary leak source as possible. If the tanks are inside, the
detector is typically placed as shown above. If the tanks are outside, the detector is typically placed at the
connection points of the conduit.
CD-6B
Mounted ~12”
above floor
CO2
CO2
Horn/
Strobe
Entrance
Horn/
Strobe
Gas
Valves
Summary of Contents for CD-6B
Page 32: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 32 P a g e 9 2 Auto Test bUZ Menu ...
Page 33: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 33 P a g e 9 3 Configuration CON Menu ...
Page 34: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 34 P a g e ...
Page 35: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 35 P a g e ...
Page 36: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 36 P a g e ...
Page 37: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 37 P a g e ...
Page 38: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 38 P a g e ...
Page 39: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 39 P a g e 9 4 Select Test tst Menu ...
Page 40: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 40 P a g e 9 5 Calibration CAL Menu ...
Page 41: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 41 P a g e 9 6 Sensor Reset SEN Menu ...