![background image](http://html1.mh-extra.com/html/macdon/625/625_operators-manual_3199344080.webp)
79
MAINTENANCE RECORD
Sprayer Attachment Serial No. ____________________________
Combine this record with the MacDon SP Windrower Maintenance Record for complete unit service.
See Maintenance/Service section for details on each procedure. Copy these pages to continue record.
* It is recommended that Seasonal Maintenance be done prior to start of operating season.
Date
Serviced:
Maintenance
Procedure
Serviced
By:
R
R
✔
R
✔
✔
+
✔
✔
R
✔
✔
✔
✔
R
l
✔
✔
R
R
Sweep and vacuum floor matting.
l
▲
✔
✔
See "Storage Procedure" in Operation section for checklist
Wipe down inside cowling
SP Windrower cab
Pressure gauges
Pesticide label information in the cab.
Selector valve on each mast.
Vertical rubber suspension
All shields and covers are in place.
Hoses and wiring
Sprayer output calibration
Flush clean and winterize with antifreeze
Storage Procedure
SEASONALLY
Boom to ground height
Grease sprayer attachment
Charcoal cab air filter
WEEKLY
Charcoal cab air filter
DAILY
Hose clamps
Bolts and hardware are secure.
Wash sprayer/windrower
Rinse sprayer tank and plumbing system
Tire pressure and bolt torque
Protective clothing and equipment
Personal clean water wash tank
Horizontal rubber suspension bolts
Charcoal cab air filter seals
See "Break-In Period" in Operation section for checklist.
ACTION:
BREAK-IN
R
- Clean
+ - Add
✔
- Check
l
- Lubricate
▲
- Change
Hour Meter
Reading: