FGAE1000
-
D1
-
W
-
COS
-
A
-
H ASSEMBLY
≈ 10
-
30
DEG
NOTE:
When using 180 degrees over the top elevation movement during tracking, the cable bridge
can collide with the cable routing bar and associated cables. When mounting the cable bridge, be sure
the elevation system is on the horizon, then position the cable bridge 10
-
30 degrees below the horizon
to avoid collision with the cable routing bar. Confirm clearance before any un
-
manned operations.
CABLE BRIDGE