MAINTENANCE INFORMATION
90 day maintenance
1.
Visual inspection of complete system, look for rust or corrosion and loose hardware.
2.
Manually move each axis individually and LISTEN for smooth operation.
3.
Check cables for wear and cracking.
4.
Check each axis for physical looseness and or backlash (adjust if necessary).
5.
Remove covers, check and clean any excessive foreign debris.
6.
Grease main gear and worm gear.
7.
Check for proper operation of each axis.
8.
Replace covers. The use of silicone grease on the O
-
ring seals is recommended
1 year maintenance
1.
Visual inspection of complete system, look for rust or corrosion and loose hardware.
2.
Manually move each axis individually and LISTEN for smooth operation.
3.
Check cables for wear and cracking.
4.
Check each axis for physical looseness and or backlash (adjust if necessary).
5.
Remove covers, check and clean any excessive foreign debris.
6.
Check AZ
-
1000 and EL
-
1000, thrust block oil
-
light bearings for wear.
7.
Check main load bearings for each individual axis and look for radial slop and or bearing binding.
8.
Grease main gear and worm gear.
9.
Check physical limit switch operation.
10.
Check for proper operation of each axis.
11.
Replace covers. The use of silicone grease on the O
-
ring seals is recommended