background image

TROUBLESHOOTING

 

Troubleshooting

 

 

1.

 

Motors not moving.

 

A. Check for voltage coming out of control box.

 

B. Check for voltage at motor 

(AZ / EL=42 VDC).

 

C. Check all wiring from control box to motor.

 

D. Check motor for binding. 

 

 

 

 

 

2.

 

No pulse from motors.

 

A. Check all wiring from reed switch to control box.

 

B. Replace reed switch.

 

 

 

3.

 

Gear binding.

 

A.

 

Check Gears for Grease.

 

B.

 

Check gear bolts for looseness.

 

C.

 

Check gears for foreign debris.

 

D.

 

Adjust thrust block adjustment.

 

 

 

4.

 

Excess backlash

 

A.

 

Inspect worm and worm gear for wear.

 

B.

 

Inspect for thrust block bearing wear.

 

C.

 

Inspect system for loose hardware.

 

D.

 

Adjust thrust block adjustment.

 

 

 

5.

 

Excess 

3” 

bearing movement

 

A.

 

Inspect bearing for radial movement.

 

B.

 

Replace 

3” 

bearing assembly.

 

 

 

6.

 

3” 

Bearing Binding

 

A.

 

Disassemble  bearing  assembly  and  inspect  for  lubrication  and  foreign  debris.           

Reassemble and test. Replace if necessary.

 

 

For  more  complete  maintenance  and  technical  assistance,  please  contact  M2  Antenna 

Systems, Inc. at 

(559) 432

-

8873

 

 

 

 

 

Summary of Contents for AE1000-D1-W-COS-A-N

Page 1: ...c com 2018 M2 Antenna Systems Incorporated 12 20 21 REV A M2 Antenna Systems Inc Model No FGAE1000 D1 W COS A H SPECIFICATIONS Model FGAE1000 D1 W C A H Motor Type DC Motor Worm Gear Configuration Sin...

Page 2: ...e the assembly process to meet specific site requirements A quick review of the assembly notes and drawings should help firm up the appropriate strategy Please remember to double check all hardware fo...

Page 3: ...SS QTY 6 BOLT 5 16 18 X 2 0 HEX HD SS QTY 2 FLATWASHER 5 16 SS QTY 2 LOCKNUT 5 16 18 SS QTY 2 PIPE STOP AZ 1000 ASSEMBLY BOLT 3 816 X 1 0 SCKT HD SS QTY 6 3 PIPE CUSTOMER SUPPLIED PIPE CLAMP 1 QTY 3 P...

Page 4: ...E1000 D1 W COS A H ASSEMBLY BOLT 3 8 16 x 1 SS QTY 5 AZ 1000W BOLT 3 8 16 x 1 SS QTY 5 BOLT 3 8 16 x 3 4 SS QTY 1 CROSS BOOM PLUG IN USE BOLT 1 4 20 X 3 SS LOCKNUT 1 4 20 SS BOTH SIDES AZ 1000W EL 100...

Page 5: ...CABLE BRIDGE ARM FGAE1000 D1 W C0S A H ASSEMBLY CABLE BRIDGE BOLT 1 4 20 X 1 0 SS LOCKNUT 1 4 20 SS 2 4 CRADLE BOLT 1 4 20 X 3 5 SS LOCKNUT 1 4 20 SS ON CENTER CABLE PASS THROUGH...

Page 6: ...able bridge can collide with the cable routing bar and associated cables When mounting the cable bridge be sure the elevation system is on the horizon then position the cable bridge 10 30 degrees belo...

Page 7: ...the cable routing process by allowing the cable to pass through the Azimuth axis This simple change can save on costly repairs when cable get snagged keeping the system from performing LARGE NYLON TIE...

Page 8: ...will expand and contract as the elevation moves up or down in rotation Temporarily use electrical tape or nylon ties to hold the cables together and to the cable brace Drive the Elevation axis to bot...

Page 9: ...to the AZ axis then loops down and back to the full cable bundle coming from the bottom of the cable pass through 6 to 12 inches below the exit of the pass through Taping or the use of nylon tie to k...

Page 10: ...OLT 1 4 20 X 1 0 HEX HEAD S S 2 LOCK NUT 1 4 20 S S 6 SCREW 8 32 X 1 2 SET S S 4 ALLEN KEY 5 64 1 OPTIONAL KITS PIPE MOUNT KIT 3 FGAEPMK3 DESCRIPTION QTY 3 PIPE CLAMP M2AMC0144 3 3 PIPE CLAMP CAP M2AM...

Page 11: ...onstant through the limit switches and through to the positioner When the limit switch is activated it breaks the contact and stops the cur rent from continuing Reversing the positioner in the opposit...

Page 12: ...Red Black wires as shown Slide the prepared 2 Conductor Red Black 16AWG wire through the cord grip from the front of the panel Route the Red wire to position A as shown below Then route the Black wire...

Page 13: ...itioner unit that DOES NOT have cord grips or wires running into it You will see the limit switches A B the limit arm C and limit screw D as pictured to the right We have not installed the limit screw...

Page 14: ...mended 1 year maintenance 1 Visual inspection of complete system look for rust or corrosion and loose hardware 2 Manually move each axis individually and LISTEN for smooth operation 3 Check cables for...

Page 15: ...ss C Check gears for foreign debris D Adjust thrust block adjustment 4 Excess backlash A Inspect worm and worm gear for wear B Inspect for thrust block bearing wear C Inspect system for loose hardware...

Page 16: ...rotation of the adjustment bolt will move the adjustment block down moving the worm closer to the worm gear and removing backlash 5 Counter clockwise rotation of the adjustment bolt will move the adju...

Page 17: ...FUL not to overfill SEAL as ex cess pressure can blow SEAL 4 Tighten SET SCREW until flush with aluminum housing COVER SEAL FLANGE FILL LINE HOLE WITH SET SCREW COVER SEAL FLANGE is used in multiple l...

Page 18: ...or inability to use the product Some states or provinces do not allow the exclusion or limitation of liability for consequential or incidental damages so the above limitation may not apply In the even...

Reviews:

Related manuals for AE1000-D1-W-COS-A-N