
6.
Key in the IP address and followed by “/firmwareUpdate.htm” on the
URL box as below to
activate the firmware update procedure
http://192.168.0.100/firmwareUpdate.htm
And click the “Update” button to start the firmware upgrade process.
7. The following message will be shown on the display, click “Continue”
button to proceed
Summary of Contents for CINE 400-3D
Page 1: ...Service Manual M Vision CINE 400 3D HTD 8650 QDPAA AB AC HTD 8650 QDPBA BB BC...
Page 17: ...2 3 LED Indicator HTD 8650 QDPAA AB AC LED Indicator HTD 8650 QDPBA BB BC LED Indicator...
Page 28: ...5 Close Tera Term and select file to download And You ll see like follow...
Page 34: ......
Page 47: ...Remove CN1 CN2 And Check J6 Pin1 2 3 is 12V Pin4 5 6 is GND Run DLP Composer and check state...
Page 48: ...If state is fine click Flash Loader select file...
Page 49: ...Click Reset Bus Click Start Download...
Page 59: ...Step 5 Confirm the every connector position and wire dressing from the projector...
Page 61: ...Step 3 Take off the rear cover to put on the table...
Page 70: ...Step 12 Loose the 5 pcs screws on the control module...
Page 74: ...Step 2 Confirm the every wire buckle before taking off the power and ballast board...
Page 75: ...Step 3 Loose the 4 pcs screws and unplug 3 connectors to take off the ballast...
Page 76: ...Step 4 Loose the 4 pcs screws and unplug 4 connectors to take off the power board...
Page 77: ...DMD BOARD Step 1 Pull out the iron latch and unplug 3 connectors...
Page 78: ......
Page 79: ...Step 2 Loose 1 screw on DMD Board Module...
Page 80: ...Step 3 Loose 4pcs screws of DMD BOARD ASSY and then take out DMD BOARD ASSY...
Page 81: ...Step 4 Take DMD Module cover out and remove it...
Page 82: ...Step 5 Loose 6pcs screws and unplug 2 connectors to take out DMD board...