
1. Serial (RS-232) Interface Requirements
The RS-232 connection parameters will be as follows:
Bits per second: 9600
Data bits: 8
Parity: None
Stop bits: 1
Flow control: None
Commands will use only ASCII characters which can be entered
using a typical terminal emulator like Windows HyperTerminal.
Spaces and tabs can be used to improve readability and will be
ignored by the projector. All commands must end with a carriage
return (ASCII hex 0D), shown as [CR] below, to signify that the
projector can now read and execute the command.
There is a type of command be supported: operation commands.
Operation commands tell the projector exactly what to do.
Commands start witha letters:
op
for operations commands.
Operations Commands
Operations commands allow more flexible and direct control of the
projector. The syntax for operations commands is as follows:
op <operation> <command> [CR]
The command type can be one of 5 functions as shown in table 5.1
Table 5.1 : List of operations command functions
No.
Function
Command
Action on unit
1
Set
= <value>
Makes the unit take that value.
2
Get
?
Asks what the current value is.
3
Increment
+
Adds 1 to the current value.
4
Decrement -
Subtracts 1 from the current
value.
5
Execute
(none)
Performs an action such as a
reset.
Summary of Contents for CINE 400-3D
Page 1: ...Service Manual M Vision CINE 400 3D HTD 8650 QDPAA AB AC HTD 8650 QDPBA BB BC...
Page 17: ...2 3 LED Indicator HTD 8650 QDPAA AB AC LED Indicator HTD 8650 QDPBA BB BC LED Indicator...
Page 28: ...5 Close Tera Term and select file to download And You ll see like follow...
Page 34: ......
Page 47: ...Remove CN1 CN2 And Check J6 Pin1 2 3 is 12V Pin4 5 6 is GND Run DLP Composer and check state...
Page 48: ...If state is fine click Flash Loader select file...
Page 49: ...Click Reset Bus Click Start Download...
Page 59: ...Step 5 Confirm the every connector position and wire dressing from the projector...
Page 61: ...Step 3 Take off the rear cover to put on the table...
Page 70: ...Step 12 Loose the 5 pcs screws on the control module...
Page 74: ...Step 2 Confirm the every wire buckle before taking off the power and ballast board...
Page 75: ...Step 3 Loose the 4 pcs screws and unplug 3 connectors to take off the ballast...
Page 76: ...Step 4 Loose the 4 pcs screws and unplug 4 connectors to take off the power board...
Page 77: ...DMD BOARD Step 1 Pull out the iron latch and unplug 3 connectors...
Page 78: ......
Page 79: ...Step 2 Loose 1 screw on DMD Board Module...
Page 80: ...Step 3 Loose 4pcs screws of DMD BOARD ASSY and then take out DMD BOARD ASSY...
Page 81: ...Step 4 Take DMD Module cover out and remove it...
Page 82: ...Step 5 Loose 6pcs screws and unplug 2 connectors to take out DMD board...