33
IDM 510-074-1
Maintenance
English language
Operation and maintenance manual
16.
Fit the pressure roller
E
without securing it with the fasteners
D
.
17.
Repeat the operation on the other equal component.
18.
Adjust the position of the pressure rollers and secure them with the fasteners
D
.
19.
Start the machine and make sure that the operation has been carried out properly.
–
At the end of operations, check that there are no tools or other material near the
moving parts or in dangerous areas.