37
IDM 510-074-1
Maintenance
English language
Operation and maintenance manual
14.
Slide worn belt manually until coupling
P
reaches an easily accessible point.
15.
Disconnect the ends of belts.
16.
Connect the ends of new belt and insert pin
P
in order to carry out coupling.
17.
Adjust the tension of belt by means of the adjusting system
N
.
Important
Do not overtighten so as not to cause any malfunctioning.
18.
Tighten the nut
L
.
19.
Repeat the operations on other belt.
Adjust the belts to the same tension.
20.
Put the mount
H
back in its original position.
21.
Insert screw
G
and tighten it.
22.
Assemble the guard
F
, and then fasten it by using the screws.
23.
Fit the pressure roller
E
without securing it with the fasteners
D
.
24.
Repeat the operation on the other equal component.
25.
Adjust the position of the pressure rollers and secure them with the fasteners
D
.
26.
Start the machine and make sure that the operation has been carried out properly.
–
At the end of operations, check that there are no tools or other material near the
moving parts or in dangerous areas.