
GAS SUPPLY TO SIDE BURNER OR SECOND
BURNER (YELLOW)
220V
NEARBOX
Connection Gas 1/2” (provide tap)
8
Instructions for installation and use DIAMOND Gas 550V-DV-850V-DV-1150V
Opening provided in wall
for maintenance
Cable to ionistation pin
GAS SUPPLY TO MAIN BURNER ( RED)
flexible for GAS
True Vision is provided with
a direct ignition , no starting
pilot
3.1.3 The Gas connection
Valve 1/2”
After the “NEARBOX” has removed from the of the back of the fire, you can place it loosely on the
ground in proximity to the opening provided in the wall of mantelpiece. The device is always con-
nected with an approved gas tap 1/2, and preferably with a yellow gasflexible that is reachable at all
times. Provide the mantelpiece with a door so that the valve and the electrical connection is easily
accessible.
ATTENTION : DO NOT PLACE ANY DECORATION ON THE DIRECT IGNITION PIN
(be carefull to stay out of the little rectangular zone with the dcoration)
Summary of Contents for DIAMOND Gas 550V
Page 22: ...LUNA 850 DV GAS Instructions for installation and use DIAMOND Gas 550V DV 850V DV 1150V 22...
Page 40: ...40 Instructions for installation and use DIAMOND Gas 550V DV 850V DV 1150V...
Page 41: ...41 Instructions for installation and use DIAMOND Gas 550V DV 850V DV 1150V 17 CE Certification...
Page 42: ...42 Instructions for installation and use DIAMOND Gas 550V DV 850V DV 1150V...
Page 43: ...43 Instructions for installation and use DIAMOND Gas 550V DV 850V DV 1150V...