8
QUICK LIFT L520E
EN
Step 2
: Place the hydraulic power pack at least 2 meters away from the ramps without connecting it to the electricity
supply. Attach the long hydraulic hoses to the hydraulic power pack. Do not overtighten, the sealing is done automati
-
cally with the conical seat of the connections.
Step 3
: The tank of the hydraulic unit is empty. It must be filled with hydraulic oil or automatic transmission fluid before
starting operation. Approved fluids are general purpose hydraulic oils or synthetic automatic transmission oils with a
viscosity index of 32 cSt at 40°C.
Remove the fuel filler cap and fill it with up to 3.5L of oil through a clean funnel. Check the level and adjust if necessary.
Step 4
: Connect the hydraulic power pack to both booms using the quick couplings.