27
Installation All Island Hoods
Ceiling
Ceiling
1
:
Position the inner top section of the
upper arm directly on the ceiling
and above your hob and mark the
center hole, also mark fixing
positions. Make sure you are center
to your hob.
2
:
Make sure that your fixings will hold
at least 75kg in weight; this must
also be flush with the ceiling. Drill a
150mm hole in the ceiling and
connect your ducting, run it to the
outside wall, this must not exceed
4mtrs in length.
3
:
Pass the ducting hose and electrical
cable through the center hole of the
top inner arm. Proceed to secure the
arm to your ceiling using either
coach screws (provided) or coach
bolts (not provided). It is paramount
that these fixings are strong enough
to hold the weight of the hood.
Warning:
All Island hood must be flush
mounted and under no
circumstances must the chimney be
inset into the ceiling void.