10 |
P a g e
SIDE CHANNEL & BLIND INSTALLATION
FLOWCHART
Section 1.0
Are channels to be mounted on face or reveal?
FACE FIT
1.
Section 1.1 - Install roller tube, prepare Evo MagnaTrack channels
2.
Section 2.1 - Assemble the bottom bar
3.
Section 3.1 - Install Evo MagnaTrack channels and front cover
4.
Section 4 - Donut adjustment and probe securing
5.
Section 5 - Assemble headbox (if applicable)
REVEAL FIT
1.
Section 1.2 - Is reveal out of square over 20mm?
2.
NO
- Section 1.2.1 - Install channels and front cover
YES
- Section 1.2.2 - Install U-Channels and front cover
3.
Section 2.2 - Install roller tube
4.
Section 3.2 - Install bottom bar
5.
Section 4 - Donut adjustment and probe securing
6.
Section 5 - Assemble headbox (if applicable)
Summary of Contents for EVO MagnaTrack
Page 1: ...EVO MagnaTrack Installation Manual ...
Page 12: ...12 P a g e FACE FIT APPLICATION ...
Page 19: ...19 P a g e REVEAL FIT INSTALLATION ...
Page 22: ...22 P a g e STEP 2 Install Evo MagnaTrack Channels STEP 3 Repeat steps 1 and 2 for other side ...