
13
0698-501 B200 - 08/2020
en
4. Transport and storage
4.1 Transport
Unpacking and checking condition of delivery
►
Unpack the pump tube on receipt and check for transport damages.
►
Report transport damages to the manufacturer immediately.
►
Check that the consignment is complete as ordered.
4.2 Storage
!
WARNING
Danger of injury and intoxication when handling hazardous liquids!
►
Always wear protective equipment when working on the pump.
►
Complete emptying of pump tube.
►
Store the pump at a protected and easy accessible place.
5. Installation/Assembly and connection
!
DANGER
Danger of injury and intoxication when handling hazardous liquids!
►
The valve spool on the container (IBC) may only be opened if it is ensured that pump, hose and shut-off
valve are professionally mounted. When starting up, ensure leak tightness.
►
During liquid removal, the container (IBC) must be adequately ventilated.
►
In case of dangerous media, an outlet tank must absolutely be provided.
►
Pump protrudes from the container and must be installed away from the traffic route.
►
Install an EMERGENCY OFF device outside the hazardous area.
5.1 Assembly of pump tube and motor
3
Motor is switched off
3
Coupling to turn easily
►
Connect the motor with the pump tube.
►
Turn the motor slightly to ensure that the driver engages in the coupling.
►
Firmly connect the motor and pump tube by means of the handwheel (right-hand thread) (
→
Fig. 2).