
41
Slit the cable conduit for the mains
cable (and as appropriate, the
control lines).
Guide the mains cable (and the
control line) into the wall installa-
tion housing through the side
cable support sleeve and connect
these.
For this purpose, take the mains
connection circuit board from the
wall installation housing and re-
turn it after completed mains con-
nection.
For electrical connection see
chapter "Electrical connection
-
wiring diagrams".
Caution! All assembly work
on the ventilation device
may be implemented only
with all
-
pole disconnected
mains voltage!
Installation of the EPP adapters:
Insert the EPP adapter into the wall
break
-
through pipe from externally.
Note here that you the insert EPP
adapters with vertical cross
-
piece
and matching the flap close
-
off.
As appropriate, shorten the EPP
adapters pipe
-
flush.
In order to guarantee air sealing
and condensate drainage, the EPP
adapters must sit closely pressed
together in the wall installation
pipe.
Installation
-
Installation of EPP adapter and external panels
The installation of the external panels 1/EGA and the weather
-
protection bonnets 1/HWE
-
2
and 1/HAZ
-
2 is implemented in accordance with the assembly instructions enclosed with
these parts.
outer
EPP adapter
Pipe
Note the vertical
position of the
central web!
With this side, insert
the EPP adapters into
the pipe first!
EN
Minimung of the cable length:
20 cm.
Summary of Contents for Nexxt
Page 24: ...24 Notifica d errore correzione errore...
Page 50: ...50 Fault signals Fault remedying EN...
Page 52: ...52 Notes EN...
Page 54: ...54...