Lumin Smart Panel - Outdoor
DOCUMENTATION AND INSTALLATION MANUAL
5
Required Materials (Not Included)
NOTE:
Additional supplies may be required depending on the existing electrical panel installation. A
NON-GFCI dual-pole breaker of 15 to 20 amps may be required to power the LSP. Appropriately rated,
NON-GFCI breakers may be double-tapped depending on local electrical codes. See pg. 17 for more
details. A supply-side connection (line-side tap) and/or wire extension
may be required for the LSP’s
Grid Detection Circuit (see pg. 28). Specific wire extension supplies may be required for current
transformers (see pg. 26). Liquid-tight conduit
(3/4” trade size)
may be required for communication
wiring (see pg. 31). The conduit provided is 2
”
(trade size) NMLT Type B. Additional NMLT Type B
conduit and fittings maybe required depending on installation conditions. The installer may orient the
provided 90 deg conduit elbow to the left or right side or replace it with a different 2
”
(trade size) NMLT
Type B fitting.
For outdoor installations:
The installation orientation of the LSP must plumb and level with the
conduit fitting at the bottom of the enclosure. All conduit and fittings between the LSP, the electrical
panel, and/or the optional communication cable routes must be
liquid-tight conduit
.
Supply-side/line-side tap
(Optional)
Cable ties (Optional)
Pen or marker
Wire splice connectors
Dual-pole breaker: 15 to 20 amps
(Optional)
3/4" Liquid-tight conduit and
fittings (Optional Ethernet cable)