![Lumascape ZDClink Luxor SATlink Owner'S Manual Download Page 12](http://html1.mh-extra.com/html/lumascape/zdclink-luxor-satlink/zdclink-luxor-satlink_owners-manual_1947513012.webp)
12
Operating the Controller
Activity Screen
After five minutes of inactivity, an
Activity
screen will appear on
the LCD screen if the lights are running. The wait time is reduced
to only five seconds when the current screen is the
Home
screen.
The
Activity
screen displays:
• Chassis Load: Shows the amp load of the controller chassis,
displayed from 1 to 10. Only a chassis with an active load will
display an orange load bar.
• Current Time: Provides current time for tracking purposes.
• Source: Lists the source of the transformer load as either
Manual or Schedule.
No selections can be made on this screen; it is simply an activity
display. Press the
Home
button to return to the
Home
screen.
Figure 9: Activity screenshot
Diagnostics Screen
• Chassis Number: Lists the chassis by number.
• Assigned: Identifies the assigned controller.
• Communicating: Indicates if the controller is communicating.
• Overloaded: Signals when a controller is overloaded.
• Chassis Load: Shows the percentage of controller load.
Figure 10: Diagnostics screenshot
Summary of Contents for ZDClink Luxor SATlink
Page 39: ...39 Notes ...