Operating Manual CHM 15k
R13 / 07-2019
Installation
16
6.1.2 Installing on the foundation
CAUTION
The CHM 15k weighs 70 kg, heavy equipment may cause serious injury.
Do not attempt to move the CHM 15k without adequate help
At least two people are required to install the ceilometer
Install the CHM 15k ceilometer as follows:
Unload the CHM 15k from the transport equipment and set it down as close as possible to
the place of installation
Figure 5
CHM 15k packed and in transport position
Remove the packaging
Unscrew the side panels
Remove the side panels individually
Figure 6
CHM 15k with Styrofoam or paper honeycomb packing pads.
1 Here: Polystyrene packaging
2 CHM 15k
3 Pallet
Summary of Contents for CHM 15k
Page 1: ...General Information 1 Titelseite...
Page 73: ...Index of Tables 73...