Installa� on and opera� ng instruc� ons for storage hea� ng
Feel good with heat from electricity - www.technotherm.de
GB
9|
Installa� on
Posi� oning
Please read the instruc� ons in the introductory sec� on concerning posi� on, safety and load-bearing
capacity.
If in doubt, consult a building engineer.
Transport
To facilitate transport, the heater and the bricks are packaged separately. The 7 bricks per core column
are packed in two’s and three’s.
The hea� ng elements are factory fi � ed and pre-wired.
Prepara� on
In order to avoid unnecessary scratching or other damage to the heater it is advised to unpack it close
to its proposed place of installa� on.
Tip the carton on its back and remove the screws from the wooden pale� e to which the base of the
heater is a� ached.
Bring the carton back upright, cut the bands and pull the carton from the heater. Remove the wooden
ba� ens and the plas� c covering and the take the heater from its pale� e.
The
installa� on
can now begin:
Unscrew the two screws holding the right-hand side panel and, a� er pulling off the regulator knob, pull
the panel outwards and downwards to remove.