2.
Ensure that the SM is linked to the AM. This can be observed on the 111 page of
the MCC. If the link is established, there will be an unbroken line shown
connecting the AM box and the text: SMxxx. If there is a box shown breaking
the line connecting the AM and SM, seek technical assistance.
Also, verify that cabling between the SM and the AM by executing the command
“
RST:MCTSI
” on the standby side. If diagnostics fail on phase
9
seg
2000
, the
cables to SAI-1 (PCI slot 1) and SAI–0 (PCI slot 2) may be reversed. Swap the
cables and re-execute the diagnostics. If there is any other failure, contact the
next level of support.
3.
Check the
124
page to verify if the DCI and ASM are in service. If not, execute
the following command:
ping ###.###.###.###
This is the IP address which was recorded in A6.7 Step
6
. If the ping fails,
contact the next level of support.
4.
Ensure that all terminals and printers are operating correctly. Examples of tests
on terminals are:
•
For each STLWS, verify that 111 page can be displayed.
•
For a remote STLWS, verify that system can be accessed and that 111 page
can be displayed.
•
For the ROP, verify that OP:CLK output prints normally.
If any problems are seen and cannot be resolved by following the recommended
procedures in the appropriate DRM User’s Guide, seek technical assistance.
5.
Ensure the correct operation of the datalink applications for the office.
•
Perform tests of the ability to send AMA billing data over datalinks to the
remote receiver according to normal local procedures.
•
Perform a test of the ability to download a file from SCANS.
•
If equipped, test the operation of the TDMS/EADAS processes over the
datalinks. Refer to the DRM User’s Guide, Section 8.11.7.
•
If SCC/TNM is equipped, ensure that the SCC/TNM connection to the remote
monitoring station is working normally.
A5.15
Backup the Operating System and
5ESS
-2000 Software
It is recommended that a new set of full office backup tapes be created after the new
system is verified. This should include:
•
Full Office Backup
•
Backup of Sun Operating System and Emulator
Note:
A DDS2 (120M) or greater DAT tape is required to write on the
Netra
20.
The
Netra
20 DDS4 DAT drive WILL NOT write to a 90M tape.
To produce a full set of office backup tapes the 5ESS®-2000 Switch Routine
Operations and Maintenance Procedures, Section 6.23, "Make Full Office Backup
Tape." or Section 6.41 "Schedule Backup To Tape Using Automated System Backup
Feature"
APPENDIX 5
5ESS Switch DRM Administrative Workstation
NETRA
t 1120
to
NETRA
20 WITH SOLARIS 8 OS CONVERSION PROCESS
GUIDELINES
235-200-150
May 2003
Page A5-8
Issue 3.00
Summary of Contents for 5ESS DRM
Page 1: ...5ESS Switch Distinctive Remote Module DRM User s Guide 235 200 150 Issue 3 00P June 2007...
Page 4: ......
Page 6: ......
Page 8: ......
Page 90: ......
Page 108: ......
Page 122: ......
Page 128: ......
Page 140: ......
Page 176: ......
Page 184: ......
Page 186: ......
Page 198: ......
Page 216: ......
Page 222: ......
Page 234: ......
Page 238: ......
Page 242: ......
Page 244: ......
Page 246: ......
Page 250: ......
Page 254: ......
Page 262: ......
Page 272: ......
Page 274: ......
Page 276: ......
Page 278: ......
Page 282: ......
Page 286: ......
Page 288: ......
Page 290: ......
Page 294: ......
Page 304: ......
Page 306: ......
Page 312: ......
Page 318: ......
Page 332: ......
Page 334: ......
Page 336: ......
Page 348: ......
Page 358: ......
Page 360: ......
Page 362: ......
Page 368: ......
Page 376: ......
Page 382: ......
Page 404: ......
Page 406: ......
Page 414: ......
Page 432: ......
Page 450: ......
Page 456: ......
Page 462: ......
Page 468: ......
Page 490: ......
Page 494: ......
Page 496: ......
Page 498: ......
Page 500: ......
Page 502: ......
Page 504: ......
Page 506: ......
Page 526: ......
Page 528: ......
Page 530: ......
Page 536: ......
Page 542: ......
Page 548: ......
Page 552: ......
Page 558: ......
Page 562: ......
Page 568: ......
Page 572: ......
Page 576: ......
Page 602: ......
Page 610: ......
Page 622: ......
Page 642: ......