Lucent Technologies 1200A 24V ECS Battery Plant J85500E-2
5 - 6 Installation
Issue 7 October 1998
Controller and
LVD Set-up
1. Follow the controller set-up procedure given in the
Controller manual to complete the following:
a. Enable/disable equalize charge set-up
b. Enable/disable rectifier restart set-up
c. Set HV shutdown level(s)
d. Set BD alarm level
e. Run office alarm wiring
f.
Run other controller wiring
g. Set up other optional circuit packs
2. Check and set the low-voltage disconnect/reconnect, if
provided, at the desired voltage level. See Figure 5-4 for
the location of the disconnect voltage select jumpers,
J505.1 and J505.2 on CP5 Fuse Board.
a. To provide a disconnect voltage of +21.25 +/-0.5 volts,
plug these jumpers across pins 1 and 2 of their
respective connectors
b. To provide a disconnect voltage of +20.25 +/-0.5 volts,
plug the jumpers across pins 2 and 3 of their respective
connectors.
3. Refer to the ECS controller manual for acceptance testing
procedures for the CP5 circuit pack and the associated
LVD/R option.
AC Wiring,
Rectifier
Installation and
Test
Refer to the installation and start-up procedure in the Rectifier
manual for the following steps.
•
Wire AC
•
Set up
•
Plug in
•
Test
Note
It is recommended that ac be wired during the initial
installation for all rectifier positions that may be used in the
future. If ac is prewired in this way, growth in rectifier
capacity is as simple as plugging in an additional rectifier.