
Task 14: Perform Initial DEFINITY AUDIX Administration
Issue 2 December 1996
3-29
The system displays the Voice Group Status screen.
5. Make sure all the ports that are supposed to be active are shown on the
screen with the correct location and extension and that the State field
shows ISI (In-Service Idle).
6. If any of the port information is incorrect, see
DEFINITY AUDIX
System — Maintenance
book, 585-300-110 for complete troubleshooting
procedures.
7. Type status switch-link and enter
to check the status of the
switch link set up in Task 14E: Set Switch-Link Parameters. The screen
should show the state field as ISB and the DCIU Switches that are
administered should show I in the DCIU Switches field. If the values on the
screen differ from the values just given, see
DEFINITY AUDIX System —
Maintenance
book, 585-300-110 for complete troubleshooting
procedures.
8. Proceed to Task 15: Activate Parameters and Basic Features.
Step 7 is required only if the DEFINITY AUDIX system will use CL integration. If
not, skip to step 8.
RETURN
Summary of Contents for Definity Audix System
Page 14: ...About This Document xiv Issue 2 December 1996...
Page 22: ...Prerequisites 1 8 Issue 2 December 1996...
Page 96: ...Initial System Administration 3 38 Issue 2 December 1996...
Page 170: ...Option Settings B 20 Issue 2 December 1996...