Solvent Cement Cold Weather Applications
Store bulk quantities in location above 40°F (4°C). If solvent
cement gels:
‣
Bring it into a warm environment (60°-90°F or 16°-32°C) and
allow to sit for 24 hours.
‣
Do not artificially heat.
‣
Shake vigorously before use.
Cutting and Joining
‣
Cut pipe squarely, using ratchet cutter, wheel-type plastic
tubing cutter, power saw or fine-tooth saw.
‣
Deburr inside/bevel outside of pipe.
‣
Test fit the pipe.
‣
First apply cement to outside of pipe.
‣
Apply cement (without dipping back into the can) to inside
of fitting socket. On sizes 1¼" (32mm) and larger, dip
cement and apply to pipe again.
‣
Insert pipe end into socket while rotating pipe a quarter
turn. Hold 30 seconds.
4